The Study of the Appraisal Selects on Halon Agent Substitution

碩士 === 國立臺北科技大學 === 土木與防災研究所 === 96 === When planned and designed the Muzha and Danshul lines of Taipei Metro Systems in 70s, many of electrical equipments/devices were installed in related stations and maintenance depot, such as Facility power substation, traction power substation, low voltage dist...

Full description

Bibliographic Details
Main Authors: Fu-An Yeh, 葉富安
Other Authors: 張寬勇
Format: Others
Language:zh-TW
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/u29m6t