The Study and Implementation of Working-Hour and cost Estimation System for Power Supply Pilot Run
碩士 === 聖約翰科技大學 === 自動化及機電整合研究所 === 96 === ABSTRACT For a product at mass production stage, the standard working-hour is set up in advance. However, the actual working-hour may not be equal to the standard working-hour. In addition, so far in the product sample development stage, PVT (Prototype Veri...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/49197264709739743617 |