Improved Analyses of Construction Baseline Productivity
博士 === 國立高雄第一科技大學 === 工程科技研究所 === 96 === The purpose of this study was to find standard and reasonable measures to derive labor baseline productivity which is the best productivity of constructor in any project. The BP could be used as criteria to forecast schedule and cost, as well as to evaluate l...