Investigating the Laboratory Experiments to Estimate Pre-Stress on Changchikeng Sandstone
碩士 === 國立成功大學 === 土木工程學系碩博士班 === 96 === Tsengwen reservoir transbasion diversion tunnel has the largest thickness of overburden roughly 1300 m, which will be excavated in Changchikeng sandstone. The in-situ stress is expected to govern the stability of the tunnel. Thus, this study is focus on invest...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/43406970859031153290 |