Investigating the Laboratory Experiments to Estimate Pre-Stress on Changchikeng Sandstone

碩士 === 國立成功大學 === 土木工程學系碩博士班 === 96 === Tsengwen reservoir transbasion diversion tunnel has the largest thickness of overburden roughly 1300 m, which will be excavated in Changchikeng sandstone. The in-situ stress is expected to govern the stability of the tunnel. Thus, this study is focus on invest...

Full description

Bibliographic Details
Main Authors: Shu-chi Chan, 詹恕齊
Other Authors: Chien-hung Wu
Format: Others
Language:zh-TW
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/43406970859031153290