The study about the Pre-camber of bridge construction — the balanced cantilever method

碩士 === 高苑科技大學 === 土木工程研究所 === 96 === Pre-camber control of the cast-in-site balanced cantilever method is a very important link during the construction. If the camber is too different from the original design, the cantilever segments on both sides won’t be connected accurately. It needs exerting ano...

Full description

Bibliographic Details
Main Authors: Wang weilin, 王維麟
Other Authors: Lai jinhua
Format: Others
Language:zh-TW
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/86736203920664101637