Application of Theory of Constraints and Ant Algorithm in Flowshop Scheduling Problem: A Case Study of Color Filter Factory
碩士 === 元智大學 === 工業工程與管理學系 === 95 === Production scheduling is an NP-hard problem for manufacturing factories. Both the inside capacity conditions and the outside environmental changes can influence the scheduling planning; however, the goods delivery is not allowed to be delayed, which can cause a s...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/26041810048848752639 |