Extended Factor-based Concept for Construction Project Evaluation and Control

博士 === 國立臺灣科技大學 === 營建工程系 === 95 === Contractors usually adopt deterministic estimates to evaluate construction project durations and costs without the consideration of uncertainties. In the environment congested with uncertainties, it is not appropriate to evaluate or control construction projects...