PREDICTING ALLOCATION OF ON-SITE SUPERVISORY MANPOWER FOR CONSTRUCTION PROJECTS

碩士 === 國立中央大學 === 營建管理研究所 === 95 === In the highly competitive construction industry of Taiwan, a slightly inaccurate estimation of a project can easily cause loss of the bid, especially in erroneously estimating costs and allocation of on-site supervisory manpower that usually offsets the profit ga...

Full description

Bibliographic Details
Main Authors: Huang-Jhun Wei, 黃俊維
Other Authors: Chen-Jieh Haur
Format: Others
Language:zh-TW
Published: 2006
Online Access:http://ndltd.ncl.edu.tw/handle/93536331713707906132