Performing Time-Cost Trade-Off Analysis via FMGA-Simulation Mechanism

碩士 === 朝陽科技大學 === 營建工程系碩士班 === 95 === Construction project is composed of a network of activities. To perform the activities of a project, construction planners usually can select construction methods or technologies and associated resources including crew sizes and equipment. Different construction...

Full description

Bibliographic Details
Main Authors: Yi-ting Cheng, 鄭衣婷
Other Authors: Tao-ming Cheng
Format: Others
Language:zh-TW
Published: 2007
Online Access:http://ndltd.ncl.edu.tw/handle/10006555687105047258
id ndltd-TW-095CYUT5582048
record_format oai_dc
spelling ndltd-TW-095CYUT55820482015-10-13T16:51:31Z http://ndltd.ncl.edu.tw/handle/10006555687105047258 Performing Time-Cost Trade-Off Analysis via FMGA-Simulation Mechanism 結合快速混亂基因演算法與離散事件模擬技術求解時間成本權衡問題 Yi-ting Cheng 鄭衣婷 碩士 朝陽科技大學 營建工程系碩士班 95 Construction project is composed of a network of activities. To perform the activities of a project, construction planners usually can select construction methods or technologies and associated resources including crew sizes and equipment. Different construction methods and related resource combination for performing an activity create various durations and costs for that particular activity and together for a project. Hence, planners have to face the decisions of finding the most cost effective way to complete a project within the desirable duration for a project. These decisions are usually made based on the so-called time-cost trade-off (TCT) analysis. The purpose of such analysis is to reduce the project cost but not to impact the project duration. The results of TCT analysis provide a TCT curve that the associated duration and cost for each resource combination can be observed and ultimately the balance of time and cost can be optimized. This research is aiming at presenting a mechanism that integrates fast messy genetic algorithms (FMGA) and discrete event simulation technique to solve TCT problems. The construction operations are modeled by discrete event simulation technique to obtain the duration and cost for a project. Then, the impact on time and cost for possible resource combinations are verified and screened by FMGA. Examples show that the proposed FMGA-simulation mechanism can efficiently locate the solutions for TCT analysis. Tao-ming Cheng 鄭道明 2007 學位論文 ; thesis 56 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 朝陽科技大學 === 營建工程系碩士班 === 95 === Construction project is composed of a network of activities. To perform the activities of a project, construction planners usually can select construction methods or technologies and associated resources including crew sizes and equipment. Different construction methods and related resource combination for performing an activity create various durations and costs for that particular activity and together for a project. Hence, planners have to face the decisions of finding the most cost effective way to complete a project within the desirable duration for a project. These decisions are usually made based on the so-called time-cost trade-off (TCT) analysis. The purpose of such analysis is to reduce the project cost but not to impact the project duration. The results of TCT analysis provide a TCT curve that the associated duration and cost for each resource combination can be observed and ultimately the balance of time and cost can be optimized. This research is aiming at presenting a mechanism that integrates fast messy genetic algorithms (FMGA) and discrete event simulation technique to solve TCT problems. The construction operations are modeled by discrete event simulation technique to obtain the duration and cost for a project. Then, the impact on time and cost for possible resource combinations are verified and screened by FMGA. Examples show that the proposed FMGA-simulation mechanism can efficiently locate the solutions for TCT analysis.
author2 Tao-ming Cheng
author_facet Tao-ming Cheng
Yi-ting Cheng
鄭衣婷
author Yi-ting Cheng
鄭衣婷
spellingShingle Yi-ting Cheng
鄭衣婷
Performing Time-Cost Trade-Off Analysis via FMGA-Simulation Mechanism
author_sort Yi-ting Cheng
title Performing Time-Cost Trade-Off Analysis via FMGA-Simulation Mechanism
title_short Performing Time-Cost Trade-Off Analysis via FMGA-Simulation Mechanism
title_full Performing Time-Cost Trade-Off Analysis via FMGA-Simulation Mechanism
title_fullStr Performing Time-Cost Trade-Off Analysis via FMGA-Simulation Mechanism
title_full_unstemmed Performing Time-Cost Trade-Off Analysis via FMGA-Simulation Mechanism
title_sort performing time-cost trade-off analysis via fmga-simulation mechanism
publishDate 2007
url http://ndltd.ncl.edu.tw/handle/10006555687105047258
work_keys_str_mv AT yitingcheng performingtimecosttradeoffanalysisviafmgasimulationmechanism
AT zhèngyītíng performingtimecosttradeoffanalysisviafmgasimulationmechanism
AT yitingcheng jiéhékuàisùhùnluànjīyīnyǎnsuànfǎyǔlísànshìjiànmónǐjìshùqiújiěshíjiānchéngběnquánhéngwèntí
AT zhèngyītíng jiéhékuàisùhùnluànjīyīnyǎnsuànfǎyǔlísànshìjiànmónǐjìshùqiújiěshíjiānchéngběnquánhéngwèntí
_version_ 1717775840277692416