Prediction of Plasterer''s Working Postures and Maximum Working Time Using Back-Propagation Network
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 95 === Two BPN (back-propagation network) models were established in this study. The first is to predict the risk level of plasterer’s working postures and the second is to forecast plasterer’s maximal working time (MWT) under specific posture. Input variables in the f...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/31248188678973109656 |