RESOURCE-DRIVEN OPTIMIZATION MODEL FOR CONSTRUCTION MULTI-PROJECT SCHEDULING PROBLEMS
碩士 === 國立雲林科技大學 === 營建工程系碩士班 === 93 === According to the research by Payne (1995), an investigation through small to mid-size construction contractors showed that 84% of construction contractors execute their projects in a multi-project environment. In a multi-project environment, scheduling proble...
Main Authors: | Yu-Yuan Chieng, 鄭有原 |
---|---|
Other Authors: | Shu-Shun Liu |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/99461543338884765263 |
Similar Items
-
The Development of the Optimal Crashing Strategy for the Resource Constrained Project Scheduling Problems
by: Chih-Chung Cheng, et al.
Published: (2007) -
The Optimal Project Scheduling using Resource Transfer and Addition Strategy for the Resource Constrained Project Scheduling Problems
by: Kuo, Meichen, et al.
Published: (2011) -
Solving Multi-Resource Constrained Project Scheduling Problem using Ant Colony Optimization
by: Hsiang-Hsi Huang, et al.
Published: (2015-01-01) -
The Study of Particle Swarm Optimization for The Multi-Mode Resource-Constrained Project Scheduling Problem
by: Chung-Lun Wu, et al.
Published: (2009) -
Applying the Particle Swarm Optimization Technique to the Resource-Constrainted Multi-Project Scheduling Problem
by: Li-Chuan Huang, et al.
Published: (2006)