RESOURCE-DRIVEN OPTIMIZATION MODEL FOR CONSTRUCTION MULTI-PROJECT SCHEDULING PROBLEMS
碩士 === 國立雲林科技大學 === 營建工程系碩士班 === 93 === According to the research by Payne (1995), an investigation through small to mid-size construction contractors showed that 84% of construction contractors execute their projects in a multi-project environment. In a multi-project environment, scheduling proble...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/99461543338884765263 |