RESOURCE-DRIVEN OPTIMIZATION MODEL FOR CONSTRUCTION MULTI-PROJECT SCHEDULING PROBLEMS

碩士 === 國立雲林科技大學 === 營建工程系碩士班 === 93 === According to the research by Payne (1995), an investigation through small to mid-size construction contractors showed that 84% of construction contractors execute their projects in a multi-project environment. In a multi-project environment, scheduling proble...

Full description

Bibliographic Details
Main Authors: Yu-Yuan Chieng, 鄭有原
Other Authors: Shu-Shun Liu
Format: Others
Language:zh-TW
Published: 2005
Online Access:http://ndltd.ncl.edu.tw/handle/99461543338884765263
id ndltd-TW-093YUNT5582002
record_format oai_dc
spelling ndltd-TW-093YUNT55820022015-10-13T11:54:00Z http://ndltd.ncl.edu.tw/handle/99461543338884765263 RESOURCE-DRIVEN OPTIMIZATION MODEL FOR CONSTRUCTION MULTI-PROJECT SCHEDULING PROBLEMS 考慮資源型態之營建有限資源多專案排程模式 Yu-Yuan Chieng 鄭有原 碩士 國立雲林科技大學 營建工程系碩士班 93 According to the research by Payne (1995), an investigation through small to mid-size construction contractors showed that 84% of construction contractors execute their projects in a multi-project environment. In a multi-project environment, scheduling problems with resource constraints are much more complicated than those in a single project. One of the most important factors that influence multi-project scheduling problems is resource allocation policy, depending on the types of resources, which can be defined by the way of resource acquisition and sharing behavior. This paper discusses resource allocation mechanism for construction multi-project scheduling issues, and then presents an optimization-based model to resolve resource allocation problems. This research developed a CP-based (Constraint-Programming) model, which is capable of handling different optimization objectives such as minimizing total cost, overall project duration, subject to resource assignment combinations for each activity. Based on the research results, the influence of different types of resource quantity on multi-project duration is discussed. Moreover, resource competitive behavior among all projects is recognized. It concludes that the effective increment of critical resources can reduce overall project duration. The major goal of this research is to find the relation among duration-cost-resource in a multi-project environment, and provide systematic information for construction parties when making resource allocation decisions. Shu-Shun Liu 劉述舜 2005 學位論文 ; thesis 106 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立雲林科技大學 === 營建工程系碩士班 === 93 === According to the research by Payne (1995), an investigation through small to mid-size construction contractors showed that 84% of construction contractors execute their projects in a multi-project environment. In a multi-project environment, scheduling problems with resource constraints are much more complicated than those in a single project. One of the most important factors that influence multi-project scheduling problems is resource allocation policy, depending on the types of resources, which can be defined by the way of resource acquisition and sharing behavior. This paper discusses resource allocation mechanism for construction multi-project scheduling issues, and then presents an optimization-based model to resolve resource allocation problems. This research developed a CP-based (Constraint-Programming) model, which is capable of handling different optimization objectives such as minimizing total cost, overall project duration, subject to resource assignment combinations for each activity. Based on the research results, the influence of different types of resource quantity on multi-project duration is discussed. Moreover, resource competitive behavior among all projects is recognized. It concludes that the effective increment of critical resources can reduce overall project duration. The major goal of this research is to find the relation among duration-cost-resource in a multi-project environment, and provide systematic information for construction parties when making resource allocation decisions.
author2 Shu-Shun Liu
author_facet Shu-Shun Liu
Yu-Yuan Chieng
鄭有原
author Yu-Yuan Chieng
鄭有原
spellingShingle Yu-Yuan Chieng
鄭有原
RESOURCE-DRIVEN OPTIMIZATION MODEL FOR CONSTRUCTION MULTI-PROJECT SCHEDULING PROBLEMS
author_sort Yu-Yuan Chieng
title RESOURCE-DRIVEN OPTIMIZATION MODEL FOR CONSTRUCTION MULTI-PROJECT SCHEDULING PROBLEMS
title_short RESOURCE-DRIVEN OPTIMIZATION MODEL FOR CONSTRUCTION MULTI-PROJECT SCHEDULING PROBLEMS
title_full RESOURCE-DRIVEN OPTIMIZATION MODEL FOR CONSTRUCTION MULTI-PROJECT SCHEDULING PROBLEMS
title_fullStr RESOURCE-DRIVEN OPTIMIZATION MODEL FOR CONSTRUCTION MULTI-PROJECT SCHEDULING PROBLEMS
title_full_unstemmed RESOURCE-DRIVEN OPTIMIZATION MODEL FOR CONSTRUCTION MULTI-PROJECT SCHEDULING PROBLEMS
title_sort resource-driven optimization model for construction multi-project scheduling problems
publishDate 2005
url http://ndltd.ncl.edu.tw/handle/99461543338884765263
work_keys_str_mv AT yuyuanchieng resourcedrivenoptimizationmodelforconstructionmultiprojectschedulingproblems
AT zhèngyǒuyuán resourcedrivenoptimizationmodelforconstructionmultiprojectschedulingproblems
AT yuyuanchieng kǎolǜzīyuánxíngtàizhīyíngjiànyǒuxiànzīyuánduōzhuānànpáichéngmóshì
AT zhèngyǒuyuán kǎolǜzīyuánxíngtàizhīyíngjiànyǒuxiànzīyuánduōzhuānànpáichéngmóshì
_version_ 1716850900364951552