Optimal Cycle Time and Workstation Layout with Concurrent Engineering
碩士 === 南華大學 === 管理科學研究所 === 93 === This study proposes a type II single-model assembly line balancing problem in considering the concurrent engineering (T2PwithCE). The proposed model applies to the theory of concurrent engineering into the assembly line balancing problem, and then aims to improve...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/42559908382313513519 |