The Study of Rowing and Carrying Out The QualityControl Cost of the Public Hydraulic Engineering –A case study of Ghi-Ghi Common Diversion Follow-Up Project
碩士 === 逢甲大學 === 土木工程所 === 93 === Abstract To carry out that contractors have to be responsible for quality control system under the “public construction quality management system,” public construction commission established guidelines for public construction quality in 1996, specifying the construct...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/06356911352608179609 |