The Study of Rowing and Carrying Out The QualityControl Cost of the Public Hydraulic Engineering –A case study of Ghi-Ghi Common Diversion Follow-Up Project

碩士 === 逢甲大學 === 土木工程所 === 93 === Abstract To carry out that contractors have to be responsible for quality control system under the “public construction quality management system,” public construction commission established guidelines for public construction quality in 1996, specifying the construct...

Full description

Bibliographic Details
Main Authors: Tso-Yin Chang, 張佐銀
Other Authors: Shin-Luh Shiau
Format: Others
Language:zh-TW
Published: 2005
Online Access:http://ndltd.ncl.edu.tw/handle/06356911352608179609