A New-Based Algorithm for Scheduling Problem in Tool Machine Industry with Constraints from Critical Part Supply
碩士 === 東海大學 === 工業工程與經營資訊學系 === 92 === In this study, we propose an algorithm for the scheduling problem in machine tool industry with considering the constraints from the supply of critical parts based on Drum-Buffer-Rope (DBR) philosophy. In the literature, most of the DBR-based algorithms solve t...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/01630530618427984518 |
id |
ndltd-TW-092THU00030031 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-092THU000300312016-06-15T04:17:30Z http://ndltd.ncl.edu.tw/handle/01630530618427984518 A New-Based Algorithm for Scheduling Problem in Tool Machine Industry with Constraints from Critical Part Supply 在工具機業關鍵零組件供料限制下運用限制驅導式排程之研究 chien-po chen 陳建柏 碩士 東海大學 工業工程與經營資訊學系 92 In this study, we propose an algorithm for the scheduling problem in machine tool industry with considering the constraints from the supply of critical parts based on Drum-Buffer-Rope (DBR) philosophy. In the literature, most of the DBR-based algorithms solve the scheduling problems in industries other than machine tool industry. The production systems in machine tool industry usually have the following characteristics; namely, long flow time and manufacturing processes with reentrants, …, etc. These characteristics makethe decision-making scenario is very different from others, and one is not able tosatisfactorily solve the scheduling problem by directly applying those DBR-based algorithms in the literature. Also, most of the existing DBR-based algorithms assume that the supply of materials will not be the constraints of the production system. In order to make it match with the real-world cases, we take into accounts the constraints from the supply of critical parts in the proposed DBR-based algorithm. By integrating our scheduling algorithms with friendly interfaces, we provide a proto-type information system as an effective decision support system for the managers of the production systems in machine industry. 胡坤德 姚銘忠 2004 學位論文 ; thesis 92 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 東海大學 === 工業工程與經營資訊學系 === 92 === In this study, we propose an algorithm for the scheduling problem in machine tool industry with considering the constraints from the supply of critical parts based on Drum-Buffer-Rope (DBR) philosophy. In the literature, most of the DBR-based algorithms solve the scheduling problems in industries other than machine tool industry. The production systems in machine tool industry usually have the following characteristics; namely, long flow time and manufacturing processes with reentrants, …, etc. These characteristics makethe decision-making scenario is very different from others, and one is not able tosatisfactorily solve the scheduling problem by directly applying those DBR-based algorithms in the literature. Also, most of the existing DBR-based algorithms assume that the supply of materials will not be the constraints of the production system. In order to make it match with the real-world cases, we take into accounts the constraints from the supply of critical parts in the proposed DBR-based algorithm. By integrating our scheduling algorithms with friendly
interfaces, we provide a proto-type information system as an effective decision support system for the managers of the production systems in machine industry.
|
author2 |
胡坤德 |
author_facet |
胡坤德 chien-po chen 陳建柏 |
author |
chien-po chen 陳建柏 |
spellingShingle |
chien-po chen 陳建柏 A New-Based Algorithm for Scheduling Problem in Tool Machine Industry with Constraints from Critical Part Supply |
author_sort |
chien-po chen |
title |
A New-Based Algorithm for Scheduling Problem in Tool Machine Industry with Constraints from Critical Part Supply |
title_short |
A New-Based Algorithm for Scheduling Problem in Tool Machine Industry with Constraints from Critical Part Supply |
title_full |
A New-Based Algorithm for Scheduling Problem in Tool Machine Industry with Constraints from Critical Part Supply |
title_fullStr |
A New-Based Algorithm for Scheduling Problem in Tool Machine Industry with Constraints from Critical Part Supply |
title_full_unstemmed |
A New-Based Algorithm for Scheduling Problem in Tool Machine Industry with Constraints from Critical Part Supply |
title_sort |
new-based algorithm for scheduling problem in tool machine industry with constraints from critical part supply |
publishDate |
2004 |
url |
http://ndltd.ncl.edu.tw/handle/01630530618427984518 |
work_keys_str_mv |
AT chienpochen anewbasedalgorithmforschedulingproblemintoolmachineindustrywithconstraintsfromcriticalpartsupply AT chénjiànbǎi anewbasedalgorithmforschedulingproblemintoolmachineindustrywithconstraintsfromcriticalpartsupply AT chienpochen zàigōngjùjīyèguānjiànlíngzǔjiàngōngliàoxiànzhìxiàyùnyòngxiànzhìqūdǎoshìpáichéngzhīyánjiū AT chénjiànbǎi zàigōngjùjīyèguānjiànlíngzǔjiàngōngliàoxiànzhìxiàyùnyòngxiànzhìqūdǎoshìpáichéngzhīyánjiū AT chienpochen newbasedalgorithmforschedulingproblemintoolmachineindustrywithconstraintsfromcriticalpartsupply AT chénjiànbǎi newbasedalgorithmforschedulingproblemintoolmachineindustrywithconstraintsfromcriticalpartsupply |
_version_ |
1718306089449029632 |