A New-Based Algorithm for Scheduling Problem in Tool Machine Industry with Constraints from Critical Part Supply
碩士 === 東海大學 === 工業工程與經營資訊學系 === 92 === In this study, we propose an algorithm for the scheduling problem in machine tool industry with considering the constraints from the supply of critical parts based on Drum-Buffer-Rope (DBR) philosophy. In the literature, most of the DBR-based algorithms solve t...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/01630530618427984518 |