Maximizing Total Profit in the Relocation Project with Generalized Due Dates

碩士 === 國立暨南國際大學 === 資訊管理學系 === 92 === The relocation problem, originated from a housing project in Boston area, is a generalized resource-constrained scheduling problem in which the capacity of a building after the redevelopment is not necessarily the same as that before the project started. In this...

Full description

Bibliographic Details
Main Authors: Ssz Ting Liu, 劉思廷
Other Authors: B.M.T. Lin
Format: Others
Language:zh-TW
Published: 2004
Online Access:http://ndltd.ncl.edu.tw/handle/85742656043645403769