The study on the suddenly continuous contracted and expanded cross-section open channel flow.

碩士 === 國立成功大學 === 水利及海洋工程學系碩博士班 === 92 ===   The manhole (or junction box) in the sewer system is same the suddenly continuous expanded and contracted cross-section in the short distance of channel. In order to design the sewer system, effect on the flow due to a series of the suddenly continuous ex...

Full description

Bibliographic Details
Main Authors: Po-Chao Chang, 張博超
Other Authors: Chang-Tai Tsai
Format: Others
Language:zh-TW
Published: 2004
Online Access:http://ndltd.ncl.edu.tw/handle/j4fd7k