The study on the suddenly continuous contracted and expanded cross-section open channel flow.
碩士 === 國立成功大學 === 水利及海洋工程學系碩博士班 === 92 === The manhole (or junction box) in the sewer system is same the suddenly continuous expanded and contracted cross-section in the short distance of channel. In order to design the sewer system, effect on the flow due to a series of the suddenly continuous ex...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/j4fd7k |