A Study of System Dynamic Based FPLM Supply Chain Model
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 92 === Full-span Pre-cast and Launching Method (FPLM) is a newly developed construction technique that has been introduced from Korea by Bureau of Taiwan High Speed Rail (BOTHSR). Due to the pre-cast production of box girder used in the project, it’s necessary to make...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/45x227 |