Solving the Economic Lot Scheduling Problem with a Single Constraint under Power-of-Two Policy

碩士 === 東海大學 === 工業工程學系 === 91 === The Economic Lot Scheduling Problem (ELSP) is an NP-hard inventory problem. The solution approaches for the ELSP may be classified into two categories, i.e., analytic approaches and heuristic approaches. However, the analytic approaches, for example, dyna...

Full description

Bibliographic Details
Main Author: 許勝翔
Other Authors: Ming-Jong Yao
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/95633295570763628487