Main Transformer Installation Planning for Mass Rapid Transit Power Systems

碩士 === 國立高雄應用科技大學 === 電機工程系碩士班 === 91 === This thesis presents a Petri Net(PN) model to deal with the main-transformer installation planning for MRT power systems according to the MRT load growth of year. The proposed model is divided into three phases: selection of the loading of year, the determin...

Full description

Bibliographic Details
Main Authors: Chih-Liang Wu, 吳志良
Other Authors: Jaw-Shyang Wu
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/96429994170780538224
id ndltd-TW-091KUAS0442016
record_format oai_dc
spelling ndltd-TW-091KUAS04420162015-10-13T17:01:35Z http://ndltd.ncl.edu.tw/handle/96429994170780538224 Main Transformer Installation Planning for Mass Rapid Transit Power Systems 大眾捷運供電系統主變壓器設置規劃 Chih-Liang Wu 吳志良 碩士 國立高雄應用科技大學 電機工程系碩士班 91 This thesis presents a Petri Net(PN) model to deal with the main-transformer installation planning for MRT power systems according to the MRT load growth of year. The proposed model is divided into three phases: selection of the loading of year, the determination of supplying transformers, and the determination of the backup transformer. To improve the operation reliability, the extra capacity of ten percent of the current loading and one extra unit of main-transformer are considered in the planning. Also, two installation schemes- disperse scheme and centralize scheme are proposed in this thesis to minimize the switching operation in case of contingencies. By the proposed PN inference network, the time of year, the number of transformer units, and the bulk supply substations to install the main transformers are determined simultaneously. Computer simulations coded by object-oriented language C++ are implemented for the Taipei MRT power system involving twelve substations. The simulation results are verified by load flow analysis for normal cases and some contingencies. Jaw-Shyang Wu 吳兆祥 2003 學位論文 ; thesis 100 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄應用科技大學 === 電機工程系碩士班 === 91 === This thesis presents a Petri Net(PN) model to deal with the main-transformer installation planning for MRT power systems according to the MRT load growth of year. The proposed model is divided into three phases: selection of the loading of year, the determination of supplying transformers, and the determination of the backup transformer. To improve the operation reliability, the extra capacity of ten percent of the current loading and one extra unit of main-transformer are considered in the planning. Also, two installation schemes- disperse scheme and centralize scheme are proposed in this thesis to minimize the switching operation in case of contingencies. By the proposed PN inference network, the time of year, the number of transformer units, and the bulk supply substations to install the main transformers are determined simultaneously. Computer simulations coded by object-oriented language C++ are implemented for the Taipei MRT power system involving twelve substations. The simulation results are verified by load flow analysis for normal cases and some contingencies.
author2 Jaw-Shyang Wu
author_facet Jaw-Shyang Wu
Chih-Liang Wu
吳志良
author Chih-Liang Wu
吳志良
spellingShingle Chih-Liang Wu
吳志良
Main Transformer Installation Planning for Mass Rapid Transit Power Systems
author_sort Chih-Liang Wu
title Main Transformer Installation Planning for Mass Rapid Transit Power Systems
title_short Main Transformer Installation Planning for Mass Rapid Transit Power Systems
title_full Main Transformer Installation Planning for Mass Rapid Transit Power Systems
title_fullStr Main Transformer Installation Planning for Mass Rapid Transit Power Systems
title_full_unstemmed Main Transformer Installation Planning for Mass Rapid Transit Power Systems
title_sort main transformer installation planning for mass rapid transit power systems
publishDate 2003
url http://ndltd.ncl.edu.tw/handle/96429994170780538224
work_keys_str_mv AT chihliangwu maintransformerinstallationplanningformassrapidtransitpowersystems
AT wúzhìliáng maintransformerinstallationplanningformassrapidtransitpowersystems
AT chihliangwu dàzhòngjiéyùngōngdiànxìtǒngzhǔbiànyāqìshèzhìguīhuà
AT wúzhìliáng dàzhòngjiéyùngōngdiànxìtǒngzhǔbiànyāqìshèzhìguīhuà
_version_ 1717778572266962944