Main Transformer Installation Planning for Mass Rapid Transit Power Systems
碩士 === 國立高雄應用科技大學 === 電機工程系碩士班 === 91 === This thesis presents a Petri Net(PN) model to deal with the main-transformer installation planning for MRT power systems according to the MRT load growth of year. The proposed model is divided into three phases: selection of the loading of year, the determin...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/96429994170780538224 |