Main Transformer Installation Planning for Mass Rapid Transit Power Systems

碩士 === 國立高雄應用科技大學 === 電機工程系碩士班 === 91 === This thesis presents a Petri Net(PN) model to deal with the main-transformer installation planning for MRT power systems according to the MRT load growth of year. The proposed model is divided into three phases: selection of the loading of year, the determin...

Full description

Bibliographic Details
Main Authors: Chih-Liang Wu, 吳志良
Other Authors: Jaw-Shyang Wu
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/96429994170780538224