Production Monitoring and Control System by Managing the Key Machines in a Wafer Fabrication Factory

碩士 === 元智大學 === 工業工程研究所 === 89 === The processes of wafer fabrication are complicated and have characters of re-entrant and rework. The lots will entry the same machine groups around 10 ~ 30 times and contains 400 ~ 600 steps. It’s process characters cause difficulties in production man...

Full description

Bibliographic Details
Main Authors: Jin-Kuo Hsiao, 蕭進國
Other Authors: Pei-Chann Chang
Format: Others
Language:zh-TW
Published: 2001
Online Access:http://ndltd.ncl.edu.tw/handle/64484265423100434782