A Methodology of Work-In-Progress Relocation in Wafer Manufacturing Plants
碩士 === 國立臺灣大學 === 工業工程學研究所 === 88 === Wafer fabrication is a capital-intensive industrial. Therefore, machine utilization is a critical issue. In this study, the machine interference problem caused by the misplaced lots in wafer fabrication is paid much attention. When a fab ramp-up too fast, the qu...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
2000
|
Online Access: | http://ndltd.ncl.edu.tw/handle/05957188983817119533 |