地震災害風險評估及地震保險之風險管理
碩士 === 國立中央大學 === 土木工程研究所 === 88 === The purpose of the thesis is to combine the engineering risk module of earthquake loss estimation with the Capacity-Based Method. Through this evolution , we can propose a rational process to assess the damage or risk due to earthquake or catastrophe....
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2000
|
Online Access: | http://ndltd.ncl.edu.tw/handle/08848735403188754674 |