A Study on Multi-Class Multi-Level Capacitated Lot Sizing Problems
碩士 === 國立清華大學 === 工業工程與工程管理學系 === 87 === Due to the exclusion of capacity constraint considerations, it is difficult for a traditional MRP calculation to obtain a feasible production plan. Also, the separation of Lot Sizing Decision and Capacity Requirement Planning calculation makes the...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1999
|
Online Access: | http://ndltd.ncl.edu.tw/handle/65042874077577481959 |