Studies on Optimal Fuzzy Scheduling for Construction Projects
碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 86 === Activity durations are generally represented by crisp values in traditional construction scheduling problems. However, due to the existence of environmentalvariation, there are many uncertainties when defining activity duration. The purpose of this thesis is t...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1998
|
Online Access: | http://ndltd.ncl.edu.tw/handle/12658553921112172027 |
id |
ndltd-TW-086NTUST512006 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-086NTUST5120062015-10-13T17:30:24Z http://ndltd.ncl.edu.tw/handle/12658553921112172027 Studies on Optimal Fuzzy Scheduling for Construction Projects 專案工程模糊排程最適化求解之探討 Chen An-Ting 陳安亭 碩士 國立臺灣科技大學 營建工程技術學系 86 Activity durations are generally represented by crisp values in traditional construction scheduling problems. However, due to the existence of environmentalvariation, there are many uncertainties when defining activity duration. The purpose of this thesis is to analyze the construction scheduling problems under uncertainty. The proposed model includes three submodels. They are resource-constrained model, time/cost trade-off model, and resource leveling model. To develop such a model, fuzzy sets theory was used to describe the uncertainactivity duration. Genetic Algorithms (GAs) was used to search optimal solutionsof the scheduling problems. α-cuts were used to transfer fuzzy activities durationinto crisp values, under scheduler''s risk acceptable level. Completely optimal fuzzy scheduling models were then discussed. Leu Sou-Sen 呂守陞 1998 學位論文 ; thesis 0 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 86 === Activity durations are generally represented by crisp values in traditional construction scheduling problems. However, due to the existence of environmentalvariation, there are many uncertainties when defining activity duration. The purpose of this thesis is to analyze the construction scheduling problems under uncertainty. The proposed model includes three submodels. They are resource-constrained model, time/cost trade-off model, and resource leveling model. To develop such a model, fuzzy sets theory was used to describe the uncertainactivity duration. Genetic Algorithms (GAs) was used to search optimal solutionsof the scheduling problems. α-cuts were used to transfer fuzzy activities durationinto crisp values, under scheduler''s risk acceptable level. Completely optimal fuzzy scheduling models were then discussed.
|
author2 |
Leu Sou-Sen |
author_facet |
Leu Sou-Sen Chen An-Ting 陳安亭 |
author |
Chen An-Ting 陳安亭 |
spellingShingle |
Chen An-Ting 陳安亭 Studies on Optimal Fuzzy Scheduling for Construction Projects |
author_sort |
Chen An-Ting |
title |
Studies on Optimal Fuzzy Scheduling for Construction Projects |
title_short |
Studies on Optimal Fuzzy Scheduling for Construction Projects |
title_full |
Studies on Optimal Fuzzy Scheduling for Construction Projects |
title_fullStr |
Studies on Optimal Fuzzy Scheduling for Construction Projects |
title_full_unstemmed |
Studies on Optimal Fuzzy Scheduling for Construction Projects |
title_sort |
studies on optimal fuzzy scheduling for construction projects |
publishDate |
1998 |
url |
http://ndltd.ncl.edu.tw/handle/12658553921112172027 |
work_keys_str_mv |
AT chenanting studiesonoptimalfuzzyschedulingforconstructionprojects AT chénāntíng studiesonoptimalfuzzyschedulingforconstructionprojects AT chenanting zhuānàngōngchéngmóhúpáichéngzuìshìhuàqiújiězhītàntǎo AT chénāntíng zhuānàngōngchéngmóhúpáichéngzuìshìhuàqiújiězhītàntǎo |
_version_ |
1717780487044333568 |