Studies on Optimal Fuzzy Scheduling for Construction Projects

碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 86 === Activity durations are generally represented by crisp values in traditional construction scheduling problems. However, due to the existence of environmentalvariation, there are many uncertainties when defining activity duration. The purpose of this thesis is t...

Full description

Bibliographic Details
Main Authors: Chen An-Ting, 陳安亭
Other Authors: Leu Sou-Sen
Format: Others
Language:zh-TW
Published: 1998
Online Access:http://ndltd.ncl.edu.tw/handle/12658553921112172027