The Study of Construction and Future Prospect of Water Supply in Taiwan
碩士 === 中原大學 === 土木工程研究所 === 86 === The construction of Taiwan water supply system started with Tam-sui water supply system in 1899 which has been built for about one hundred years. In 1996, the rate of population served with pipe was 88.85% and the total amount of water supply was 3.03 billion cube...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1998
|
Online Access: | http://ndltd.ncl.edu.tw/handle/98293809749921881505 |