Progress-Based Dispatching Rule and Simulation Scheduling for FAB
碩士 === 國立雲林科技大學 === 工業工程與管理技術研究所 === 85 === Shop floor control is an important yet complicated problem in semiconductor FAB. This research presents for FAB a progress-based (PB) dispatching rule and a due-date assignment rule using simulation. The PB rule dynamically determines the priority of in-...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1997
|
Online Access: | http://ndltd.ncl.edu.tw/handle/46047224663686062587 |