Evaluation of Duration Needed for the Pin-Lin Tunnel

碩士 === 國立台灣工業技術學院 === 營建工程技術研究所 === 85 === Due to poor geological conditions and an inadequate decision of construction method, the Pin-Lin tunnelling project is far behind original schedule. Based on the experiences learned from the pilot...

Full description

Bibliographic Details
Main Authors: Chiang, Ming-Hung, 江明洪
Other Authors: Perng Yeng-Horng
Format: Others
Language:zh-TW
Published: 1997
Online Access:http://ndltd.ncl.edu.tw/handle/49044221253773047442
Description
Summary:碩士 === 國立台灣工業技術學院 === 營建工程技術研究所 === 85 === Due to poor geological conditions and an inadequate decision of construction method, the Pin-Lin tunnelling project is far behind original schedule. Based on the experiences learned from the pilot tunnel of the Pin-Lin tunnel and a nearby tunnelling project, the progressive rate of tunnel boring machine(TBM), as well as, drill and blast(D&B) method, and the time needed for ground pretreatment is established for reevaluation and prediction of duration needed to complete the Pin-Lin tunnelling project. The duration needed to complete the project by using D&B only, TBM only, and a combination of D&B and TBM are studied. Analytical results show that using a combination of D& B and TBM is the best choice. In addition, the duration needed to complete the project can further be shortened if two additional work faces can be created through ventilation shaft.