Evaluation of Duration Needed for the Pin-Lin Tunnel
碩士 === 國立台灣工業技術學院 === 營建工程技術研究所 === 85 === Due to poor geological conditions and an inadequate decision of construction method, the Pin-Lin tunnelling project is far behind original schedule. Based on the experiences learned from the pilot...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1997
|
Online Access: | http://ndltd.ncl.edu.tw/handle/49044221253773047442 |