Integrated Rock Tunnel Logging and Decision-aid System

碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 83 === In the past, when rating the rock mass in the tunnels, the geological engineers need to duplicate the discontinuities into the paper by hand. Furthermore, the engineers determine the parameters of roc...

Full description

Bibliographic Details
Main Authors: Chung-Chin Tai, 戴仲欽
Other Authors: Sou-Sen Leu
Format: Others
Language:zh-TW
Published: 1995
Online Access:http://ndltd.ncl.edu.tw/handle/28732654799891205787
Description
Summary:碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 83 === In the past, when rating the rock mass in the tunnels, the geological engineers need to duplicate the discontinuities into the paper by hand. Furthermore, the engineers determine the parameters of rock mass and compute the total score to determine the type of the rock and the possible supporting system. When rating the rock mass engineers, must look up many data and report form. This is not an easy task on the jobsite. Because of that, the motivation of the research is to develop the Integrated Rock Tunnel Logging and Decision-aid System. The functions of this system include borehole data bookkeeping , geotechnical logs, rating of RMR and Q system parameters, semi- automatic image treatment, cross-section prediction, accidents recording, cross-reference of neighboring tunnels records, case reference and calculation of in-situ quantitative index.