Integrated Rock Tunnel Logging and Decision-aid System
碩士 === 國立臺灣科技大學 === 營建工程技術學系 === 83 === In the past, when rating the rock mass in the tunnels, the geological engineers need to duplicate the discontinuities into the paper by hand. Furthermore, the engineers determine the parameters of roc...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1995
|
Online Access: | http://ndltd.ncl.edu.tw/handle/28732654799891205787 |