Precast Segmental Double-T Girder Systems for Multi-span Highway Overpass Bridges

An alternative structural system for short span bridges is presented: a precast segmental double-T with external, unbonded post-tensioning tendons. Single-span designs from 20 to 45 m long show that the system can be implemented over a wide range of spans and that the system’s sensitivity to post-t...

Full description

Bibliographic Details
Main Author: Smith, Jeffrey Stuart
Other Authors: Gauvreau, Douglas Paul
Language:en_ca
Published: 2012
Subjects:
Online Access:http://hdl.handle.net/1807/32625