Production lead time reduction in a semiconductor capital equipment manufacturing plant through optimized testing protocols
Thesis: M. Eng. in Manufacturing, Massachusetts Institute of Technology, Department of Mechanical Engineering, 2014. === Cataloged from PDF version of thesis. === Includes bibliographical references (page 63). === Processes at a semiconductor equipment manufacturing facility were studied with the go...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | English |
Published: |
Massachusetts Institute of Technology
2015
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/93841 |