A capital equipment capacity planning methodology for aerospace parts manufacturing in a high-mix, low volume environment

Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Global Operations Program at MIT, 2012. === Page 99 blank. Cataloged from PDF version of thesis...

Full description

Bibliographic Details
Main Author: Reveley, Matthew A. (Matthew Aaron)
Other Authors: David Hardt and Roy Welsch.
Format: Others
Language:English
Published: Massachusetts Institute of Technology 2012
Subjects:
Online Access:http://hdl.handle.net/1721.1/73414