Discrete Time/cost Trade-off Problem In Project Scheduling
In project scheduling, the activity durations can often be reduced by dedicating additional resources. Time/Cost Trade-off Problem considers the compromise between the total cost and project duration. The discrete version of the problem assumes a number of time/cost pairs, so called modes, and selec...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | Eng |
Published: |
METU
2007
|
Subjects: | |
Online Access: | http://etd.lib.metu.edu.tr/upload/12608469/index.pdf |
id |
ndltd-METU-oai-etd.lib.metu.edu.tr-http---etd.lib.metu.edu.tr-upload-12608469-index.pdf |
---|---|
record_format |
oai_dc |
spelling |
ndltd-METU-oai-etd.lib.metu.edu.tr-http---etd.lib.metu.edu.tr-upload-12608469-index.pdf2013-01-07T23:12:57Z Discrete Time/cost Trade-off Problem In Project Scheduling Hafizoglu, Ahmet Baykal TA Systems Engineering 168 Project Scheduling Time/Cost Trade-off Branch and Bound In project scheduling, the activity durations can often be reduced by dedicating additional resources. Time/Cost Trade-off Problem considers the compromise between the total cost and project duration. The discrete version of the problem assumes a number of time/cost pairs, so called modes, and selects a mode for each activity. In this thesis we consider the Discrete Time/Cost Trade-off Problem. We first study the Deadline Problem, i.e., the problem of minimizing total cost subject to a deadline on project duration. To solve the Deadline Problem, we propose several optimization and approximation algorithms that are based on optimal Linear Programming Relaxation solutions. We then analyze the problem of generating all efficient solutions, and propose an approach that uses the successive solutions of the Deadline Problem. Our computational results on large-sized problem instances have revealed the satisfactory behavior of our algorithms. METU Azizoglu, Meral 2007-07-01 M.S. Thesis text/pdf http://etd.lib.metu.edu.tr/upload/12608469/index.pdf Eng To liberate the content for public access |
collection |
NDLTD |
language |
Eng |
format |
Others
|
sources |
NDLTD |
topic |
TA Systems Engineering 168 Project Scheduling Time/Cost Trade-off Branch and Bound |
spellingShingle |
TA Systems Engineering 168 Project Scheduling Time/Cost Trade-off Branch and Bound Hafizoglu, Ahmet Baykal Discrete Time/cost Trade-off Problem In Project Scheduling |
description |
In project scheduling, the activity durations can often be reduced by dedicating additional resources. Time/Cost Trade-off Problem considers the compromise between the total cost and project duration. The discrete version of the problem assumes a number of time/cost pairs, so called modes, and selects a mode for each activity.
In this thesis we consider the Discrete Time/Cost Trade-off Problem. We first study the Deadline Problem, i.e., the problem of minimizing total cost subject to a deadline on project duration. To solve the Deadline Problem, we propose several optimization and approximation algorithms that are based on optimal Linear Programming Relaxation solutions. We then analyze the problem of generating all efficient solutions, and propose an approach that uses the successive solutions of the Deadline Problem.
Our computational results on large-sized problem instances have revealed the satisfactory behavior of our algorithms. |
author2 |
Azizoglu, Meral |
author_facet |
Azizoglu, Meral Hafizoglu, Ahmet Baykal |
author |
Hafizoglu, Ahmet Baykal |
author_sort |
Hafizoglu, Ahmet Baykal |
title |
Discrete Time/cost Trade-off Problem In Project Scheduling |
title_short |
Discrete Time/cost Trade-off Problem In Project Scheduling |
title_full |
Discrete Time/cost Trade-off Problem In Project Scheduling |
title_fullStr |
Discrete Time/cost Trade-off Problem In Project Scheduling |
title_full_unstemmed |
Discrete Time/cost Trade-off Problem In Project Scheduling |
title_sort |
discrete time/cost trade-off problem in project scheduling |
publisher |
METU |
publishDate |
2007 |
url |
http://etd.lib.metu.edu.tr/upload/12608469/index.pdf |
work_keys_str_mv |
AT hafizogluahmetbaykal discretetimecosttradeoffprobleminprojectscheduling |
_version_ |
1716480178783256576 |