Discrete Time/cost Trade-off Problem In Project Scheduling
In project scheduling, the activity durations can often be reduced by dedicating additional resources. Time/Cost Trade-off Problem considers the compromise between the total cost and project duration. The discrete version of the problem assumes a number of time/cost pairs, so called modes, and selec...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | Eng |
Published: |
METU
2007
|
Subjects: | |
Online Access: | http://etd.lib.metu.edu.tr/upload/12608469/index.pdf |