Aspects of conversion of the Nelson River bipole 2 HVDC converters from 12-pulse to 6-pulse operation

In the early months of 1979, Manitoba Hydro was confronted with a serious problem involving the converter transformers for the bipole 2 operation of the Nelson River HVDC transmission system. The transformer problem left the negative pole of bipole 2, pole 3, without a converter transformer at...

Full description

Bibliographic Details
Main Author: Kolt, Robert A.
Published: 2012
Online Access:http://hdl.handle.net/1993/6629