Material Status Index for Tracking and Progress Reporting of Construction Projects

Schedule performance index of earned value method has been reported to generate misleading results at times because of its failure to account for criticality of activities involved, as well as its consideration of monetary values for status reporting. Material can be seen as the fuel needed to execu...

Full description

Bibliographic Details
Main Author: Azarm, Roya
Format: Others
Published: 2013
Online Access:http://spectrum.library.concordia.ca/977404/4/Azarm_MASc_F2013.pdf
Azarm, Roya <http://spectrum.library.concordia.ca/view/creators/Azarm=3ARoya=3A=3A.html> (2013) Material Status Index for Tracking and Progress Reporting of Construction Projects. Masters thesis, Concordia University.