Material Status Index for Tracking and Progress Reporting of Construction Projects
Schedule performance index of earned value method has been reported to generate misleading results at times because of its failure to account for criticality of activities involved, as well as its consideration of monetary values for status reporting. Material can be seen as the fuel needed to execu...
Main Author: | |
---|---|
Format: | Others |
Published: |
2013
|
Online Access: | http://spectrum.library.concordia.ca/977404/4/Azarm_MASc_F2013.pdf Azarm, Roya <http://spectrum.library.concordia.ca/view/creators/Azarm=3ARoya=3A=3A.html> (2013) Material Status Index for Tracking and Progress Reporting of Construction Projects. Masters thesis, Concordia University. |