Optimal lot streaming and scheduling of multiple jobs in two-machine no-wait flow shops

In this thesis, a heuristic method is developed to optimize the sublots sizes of a number of jobs and to sequence these jobs simultaneously in two-machine no-wait flow shops. The objective is to minimize the production cost. A no-wait manufacturing system is a production environment in which each j...

Full description

Bibliographic Details
Main Author: Li, Ming
Format: Others
Published: 2002
Online Access:http://spectrum.library.concordia.ca/1643/1/MQ68456.pdf
Li, Ming <http://spectrum.library.concordia.ca/view/creators/Li=3AMing=3A=3A.html> (2002) Optimal lot streaming and scheduling of multiple jobs in two-machine no-wait flow shops. Masters thesis, Concordia University.