Estimating productivity losses due to change orders
This thesis presents a computer model for quantifying the adverse impact of change orders on construction productivity. In order to provide an in-depth analysis of change orders and develop a reliable model, a comprehensive field study was carried out. The field study was conducted at a Montreal bas...
Main Author: | |
---|---|
Format: | Others |
Published: |
2000
|
Online Access: | http://spectrum.library.concordia.ca/1265/1/MQ59294.pdf Assem, Ihab <http://spectrum.library.concordia.ca/view/creators/Assem=3AIhab=3A=3A.html> (2000) Estimating productivity losses due to change orders. Masters thesis, Concordia University. |