Processing of the 2010 LiDAR data at the Pos Selim landslide and assessment of the uncertainty of survey information
Contract of Simpang Pulai-Lojing Highway was commenced in 1997. Since then, the unstable hillside at a site at CH23+800 in the north-western Cameron Highlands Malaysia was cut to ridge top but instability still observed. The cutting was mainly in schist and was about 250m high. In August – Septembe...
Main Authors: | , |
---|---|
Language: | English |
Published: |
The University of Hong Kong (Pokfulam, Hong Kong)
2013
|
Subjects: | |
Online Access: | http://hdl.handle.net/10722/181859 |