Processing of the 2010 LiDAR data at the Pos Selim landslide and assessment of the uncertainty of survey information

Contract of Simpang Pulai-Lojing Highway was commenced in 1997. Since then, the unstable hillside at a site at CH23+800 in the north-western Cameron Highlands Malaysia was cut to ridge top but instability still observed. The cutting was mainly in schist and was about 250m high. In August – Septembe...

Full description

Bibliographic Details
Main Authors: Lam, Hoi-lee., 林凱莉.
Language:English
Published: The University of Hong Kong (Pokfulam, Hong Kong) 2013
Subjects:
Online Access:http://hdl.handle.net/10722/181859