Optimization of electrical energy consumption and level reliability of water supply system
Generally, high operational cost is associated with all water supply system. This is as a result of the high amount of electric energy consumption ascribed to the system due to its components. The water supply system of the Mara-Japan Industrial Institute (MJII), Beranang, Selangor is one of such sy...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UTM Press,
2015.
|
Subjects: | |
Online Access: | Get fulltext |