An estimation method of the direct benefit of a waterlogging control project applicable to the changing environment

The direct benefit of a waterlogging control project is reflected by the reduction or avoidance of waterlogging loss. Before and after the construction of a waterlogging control project, the disaster-inducing environment in the waterlogging-prone zone is generally different. In addition, the categor...

Full description

Bibliographic Details
Main Authors: L. Zengmei, Q. Guanghua, C. Zishen
Format: Article
Language:English
Published: Copernicus Publications 2015-05-01
Series:Proceedings of the International Association of Hydrological Sciences
Online Access:https://www.proc-iahs.net/368/197/2015/piahs-368-197-2015.pdf
id doaj-ff4b4d45deae4b1bba8b851e918dd840
record_format Article
spelling doaj-ff4b4d45deae4b1bba8b851e918dd8402020-11-24T22:53:44ZengCopernicus PublicationsProceedings of the International Association of Hydrological Sciences2199-89812199-899X2015-05-0136819720310.5194/piahs-368-197-2015An estimation method of the direct benefit of a waterlogging control project applicable to the changing environmentL. Zengmei0L. Zengmei1Q. Guanghua2C. Zishen3Department of Water Conservancy and Hydropower Engineering, South China University of Technology, Guangzhou, 510640, ChinaState Key Laboratory of Hydraulics & Mountain River Engineering, Sichuan University, 610065, ChinaState Key Laboratory of Hydraulics & Mountain River Engineering, Sichuan University, 610065, ChinaDepartment of Water Resources & Environmental Engineering, Zhongshan University, Guangzhou, 510275, ChinaThe direct benefit of a waterlogging control project is reflected by the reduction or avoidance of waterlogging loss. Before and after the construction of a waterlogging control project, the disaster-inducing environment in the waterlogging-prone zone is generally different. In addition, the category, quantity and spatial distribution of the disaster-bearing bodies are also changed more or less. Therefore, under the changing environment, the direct benefit of a waterlogging control project should be the reduction of waterlogging losses compared to conditions with no control project. Moreover, the waterlogging losses with or without the project should be the mathematical expectations of the waterlogging losses when rainstorms of all frequencies meet various water levels in the drainage-accepting zone. So an estimation model of the direct benefit of waterlogging control is proposed. Firstly, on the basis of a Copula function, the joint distribution of the rainstorms and the water levels are established, so as to obtain their joint probability density function. Secondly, according to the two-dimensional joint probability density distribution, the dimensional domain of integration is determined, which is then divided into small domains so as to calculate the probability for each of the small domains and the difference between the average waterlogging loss with and without a waterlogging control project, called the regional benefit of waterlogging control project, under the condition that rainstorms in the waterlogging-prone zone meet the water level in the drainage-accepting zone. Finally, it calculates the weighted mean of the project benefit of all small domains, with probability as the weight, and gets the benefit of the waterlogging control project. Taking the estimation of benefit of a waterlogging control project in Yangshan County, Guangdong Province, as an example, the paper briefly explains the procedures in waterlogging control project benefit estimation. The results show that the waterlogging control benefit estimation model constructed is applicable to the changing conditions that occur in both the disaster-inducing environment of the waterlogging-prone zone and disaster-bearing bodies, considering all conditions when rainstorms of all frequencies meet different water levels in the drainage-accepting zone. Thus, the estimation method of waterlogging control benefit can reflect the actual situation more objectively, and offer a scientific basis for rational decision-making for waterlogging control projects.https://www.proc-iahs.net/368/197/2015/piahs-368-197-2015.pdf
collection DOAJ
language English
format Article
sources DOAJ
author L. Zengmei
L. Zengmei
Q. Guanghua
C. Zishen
spellingShingle L. Zengmei
L. Zengmei
Q. Guanghua
C. Zishen
An estimation method of the direct benefit of a waterlogging control project applicable to the changing environment
Proceedings of the International Association of Hydrological Sciences
author_facet L. Zengmei
L. Zengmei
Q. Guanghua
C. Zishen
author_sort L. Zengmei
title An estimation method of the direct benefit of a waterlogging control project applicable to the changing environment
title_short An estimation method of the direct benefit of a waterlogging control project applicable to the changing environment
title_full An estimation method of the direct benefit of a waterlogging control project applicable to the changing environment
title_fullStr An estimation method of the direct benefit of a waterlogging control project applicable to the changing environment
title_full_unstemmed An estimation method of the direct benefit of a waterlogging control project applicable to the changing environment
title_sort estimation method of the direct benefit of a waterlogging control project applicable to the changing environment
publisher Copernicus Publications
series Proceedings of the International Association of Hydrological Sciences
issn 2199-8981
2199-899X
publishDate 2015-05-01
description The direct benefit of a waterlogging control project is reflected by the reduction or avoidance of waterlogging loss. Before and after the construction of a waterlogging control project, the disaster-inducing environment in the waterlogging-prone zone is generally different. In addition, the category, quantity and spatial distribution of the disaster-bearing bodies are also changed more or less. Therefore, under the changing environment, the direct benefit of a waterlogging control project should be the reduction of waterlogging losses compared to conditions with no control project. Moreover, the waterlogging losses with or without the project should be the mathematical expectations of the waterlogging losses when rainstorms of all frequencies meet various water levels in the drainage-accepting zone. So an estimation model of the direct benefit of waterlogging control is proposed. Firstly, on the basis of a Copula function, the joint distribution of the rainstorms and the water levels are established, so as to obtain their joint probability density function. Secondly, according to the two-dimensional joint probability density distribution, the dimensional domain of integration is determined, which is then divided into small domains so as to calculate the probability for each of the small domains and the difference between the average waterlogging loss with and without a waterlogging control project, called the regional benefit of waterlogging control project, under the condition that rainstorms in the waterlogging-prone zone meet the water level in the drainage-accepting zone. Finally, it calculates the weighted mean of the project benefit of all small domains, with probability as the weight, and gets the benefit of the waterlogging control project. Taking the estimation of benefit of a waterlogging control project in Yangshan County, Guangdong Province, as an example, the paper briefly explains the procedures in waterlogging control project benefit estimation. The results show that the waterlogging control benefit estimation model constructed is applicable to the changing conditions that occur in both the disaster-inducing environment of the waterlogging-prone zone and disaster-bearing bodies, considering all conditions when rainstorms of all frequencies meet different water levels in the drainage-accepting zone. Thus, the estimation method of waterlogging control benefit can reflect the actual situation more objectively, and offer a scientific basis for rational decision-making for waterlogging control projects.
url https://www.proc-iahs.net/368/197/2015/piahs-368-197-2015.pdf
work_keys_str_mv AT lzengmei anestimationmethodofthedirectbenefitofawaterloggingcontrolprojectapplicabletothechangingenvironment
AT lzengmei anestimationmethodofthedirectbenefitofawaterloggingcontrolprojectapplicabletothechangingenvironment
AT qguanghua anestimationmethodofthedirectbenefitofawaterloggingcontrolprojectapplicabletothechangingenvironment
AT czishen anestimationmethodofthedirectbenefitofawaterloggingcontrolprojectapplicabletothechangingenvironment
AT lzengmei estimationmethodofthedirectbenefitofawaterloggingcontrolprojectapplicabletothechangingenvironment
AT lzengmei estimationmethodofthedirectbenefitofawaterloggingcontrolprojectapplicabletothechangingenvironment
AT qguanghua estimationmethodofthedirectbenefitofawaterloggingcontrolprojectapplicabletothechangingenvironment
AT czishen estimationmethodofthedirectbenefitofawaterloggingcontrolprojectapplicabletothechangingenvironment
_version_ 1725662085760679936