An estimation method of the direct benefit of a waterlogging control project applicable to the changing environment

The direct benefit of a waterlogging control project is reflected by the reduction or avoidance of waterlogging loss. Before and after the construction of a waterlogging control project, the disaster-inducing environment in the waterlogging-prone zone is generally different. In addition, the categor...

Full description

Bibliographic Details
Main Authors: L. Zengmei, Q. Guanghua, C. Zishen
Format: Article
Language:English
Published: Copernicus Publications 2015-05-01
Series:Proceedings of the International Association of Hydrological Sciences
Online Access:https://www.proc-iahs.net/368/197/2015/piahs-368-197-2015.pdf